Print

To provide the best possible response to the mobility requirements of the Strasbourg metropolitan population, the CTS, under the auspices of the public transport authority Eurométropole de Strasbourg, has constantly developed its network. Here you can discover all the on-going projects.


The extension of this line into Germany aims, among other things, to play a key role in the development of cross-border transport, improving services to the port zone and becoming the vector for the urban development of the Deux Rives sector which will help to refocus the metropolitan area around the Rhine. The 2.7 km extension requires several substantial items of infrastructure to be built, including a bridge over the Rhine.

 

 

Facts and figures:


Avril 2017: terminus at Kehl-Bahnhof (railway station)
* 2.7 km extension
* 4 new stops (including 3 in Strasbourg)


2018: terminus at Kehl-Rathaus (Town hall)
* Additional extension of 1.2km
* 2 new stops


4 engineering structures built in total:
* Bridge over the Rhine
* Citadelle Bridge
* Tunnel arch under the Port’s railway tracks
* Tunnel arch underneath Rue du Péage

CTS Infos 12. 6-7-8-9. Fond de carte extension D

 

Discover live progress of the work on the future bridge over the Rhine:

 

 

First deck section of the Citadelle Bridge:

 

 


The extension of line A aims to develop the use of public transport between the south of the Eurométropole, the centre of Illkirch and Strasbourg.

 

carto_extension 

Line A

Spring 2016: terminus at Illkirch Centre-Ville

* A 1.9 km extension from Lixenbuhl

* 3 new stops stations

 

Line E

Spring 2016: line spur at Campus

* Extension of 185m

* Spur for tram turnaround